How much of a Cost engineer’s job can AI already do?

A budget comes earlier. Calling the real number without selling the reckless bid do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Cost engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, rates and the budget.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the variance and the one that was not logged.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Change, the extra and not giving it away.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Close, the dispute and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Management, the bid and not selling the reckless one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The real number, and not the reckless bid.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measures
  • unit rates
  • variances
  • extras
  • disputes
  • reckless bids
  • works budgets
  • closes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Tunnel engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Heading, the geology and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Water, the inflow and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Blast, the vibration and the building.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Segment, the ring and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not come down, and not hiding the water.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tunnel headings
  • support
  • inflows
  • blasts
  • segments
  • tunnel geology
  • rings
  • vibrations

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 176Food engineer27%
  2. 177Automation engineer27%
  3. 178HVAC engineer27%
  4. 180Energy engineer27%
  5. 181Packaging engineer27%
  6. 182Reliability engineer27%