Automation index
How much of a Costume designer’s job can AI already do?
A costume sketch comes earlier. A costume you can act in that does not split on the third night do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Costume designer
22%
AI can already do 22% of this job.
#379 / 753
View rankingCostume designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
The reading, sketch and the palette.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Shop, fitting and the one you cannot sit in.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rehearsal, quick change and the one that catches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Budget, dyes and the one that is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Direction, the ego and not dressing against the text.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That you can act, and not splitting on the third.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- costume sketches
- costume fittings
- quick changes
- palette
- wardrobe shop
- dyes
- rehearsals
- costume budget
Sources for this job· O*NET 27-1022.00· ESCO/ISCO 2163
IS WORK OVER?
Facilities engineer
22%
#392 / 753
View rankingFacilities engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
CMMS, tickets and the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Roof, the chiller and the one that will not start.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Generator, the diesel and not leaving it dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fire, the pump and the monthly test.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The tenant, August and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That cooling does not die, and not leaving the generator dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- CMMS
- PPM
- chillers
- generators
- diesel
- fire pumps
- roofs
- tickets
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149