IS WORK OVER?

Automation index

How much of a Crane operator’s job can AI already do?

A lift plan comes earlier. Raising a beam and not hitting anyone does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lift plan, radii and weights.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Run the crane and place the load.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Signals, wind and exclusion zone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, foreman and maintenance.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, inspections and machine tests.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a load over someone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Lift plan, radii and weights
  • Run the crane and place the load
  • Signals, wind and exclusion zone
  • Site, foreman and maintenance
  • Logs, inspections and machine tests
  • Not leaving a load over someone
  • gruista
  • operador de grua
  • crane operator

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Biomedical equipment technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Ticket, the inventory and the calibration.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
ICU, the ventilator and not switching off the one that is ventilating.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Theatre, the stack and the one that fails at induction.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Part, the spare and the one that does not arrive.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The clinician, the rush and not leaving the kit half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it works at three, and signing the calibration.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calibrate biomedical kit
  • ventilators
  • theatre stacks
  • clinical inventory
  • spares
  • ICU
  • not switch off the one ventilating
  • tickets

Sources for this job· O*NET 49-9062.00· ESCO/ISCO 3211

Analyse my job

Jobs with similar scores

  1. 642Caregiver16%
  2. 643Formwork carpenter16%
  3. 644Stevedore16%
  4. 646Miner16%
  5. 647Scaffolder16%
  6. 648Baker16%