IS WORK OVER?

Automation index

How much of a Crane operator’s job can AI already do?

A lift plan comes earlier. Raising a beam and not hitting anyone does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lift plan, radii and weights.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Run the crane and place the load.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Signals, wind and exclusion zone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, foreman and maintenance.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, inspections and machine tests.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a load over someone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Lift plan, radii and weights
  • Run the crane and place the load
  • Signals, wind and exclusion zone
  • Site, foreman and maintenance
  • Logs, inspections and machine tests
  • Not leaving a load over someone
  • gruista
  • operador de grua
  • crane operator

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Database administrator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Tuning, indexes and execution plans.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Backups, jobs and docs.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Incidents, locks and restores.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Schema changes with development.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Permissions, audit and PII.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Capacity, cost and engine choice.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Tuning, indexes and execution plans
  • Backups, jobs and docs
  • Incidents, locks and restores
  • Schema changes with development
  • Permissions, audit and PII
  • Capacity, cost and engine choice
  • dba
  • administrador de base de datos
  • oracle dba

Sources for this job· O*NET 15-1242.00· ESCO/ISCO 2521

Analyse my job

Jobs with similar scores

  1. 602Caregiver16%
  2. 603Formwork carpenter16%
  3. 604Stevedore16%
  4. 606Miner16%
  5. 607Scaffolder16%
  6. 608Baker16%