IS WORK OVER?

Automation index

How much of a Crane operator’s job can AI already do?

A lift plan comes earlier. Raising a beam and not hitting anyone does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lift plan, radii and weights.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Run the crane and place the load.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Signals, wind and exclusion zone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, foreman and maintenance.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, inspections and machine tests.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a load over someone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Lift plan, radii and weights
  • Run the crane and place the load
  • Signals, wind and exclusion zone
  • Site, foreman and maintenance
  • Logs, inspections and machine tests
  • Not leaving a load over someone
  • gruista
  • operador de grua
  • crane operator

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Grill cook

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Cut, ageing and the requested doneness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Grill, mark and the fire that dies.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Rest, plate and the one that goes cold.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
List, shrink and the expensive cut.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The full room and not working too far ahead.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
At the point, and not drying the cut.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • mark on the grill
  • doneness
  • ageing
  • rest
  • plate
  • cuts
  • grill shrink
  • the fire

Sources for this job· O*NET 35-2014.00· ESCO/ISCO 5120

Analyse my job

Jobs with similar scores

  1. 612Caregiver16%
  2. 613Formwork carpenter16%
  3. 614Stevedore16%
  4. 616Miner16%
  5. 617Scaffolder16%
  6. 618Baker16%