IS WORK OVER?

Automation index

How much of a Crane operator’s job can AI already do?

A lift plan comes earlier. Raising a beam and not hitting anyone does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lift plan, radii and weights.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Run the crane and place the load.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Signals, wind and exclusion zone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, foreman and maintenance.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, inspections and machine tests.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a load over someone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Lift plan, radii and weights
  • Run the crane and place the load
  • Signals, wind and exclusion zone
  • Site, foreman and maintenance
  • Logs, inspections and machine tests
  • Not leaving a load over someone
  • gruista
  • operador de grua
  • crane operator

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Hotel manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Occupancy, rates and the forecast.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Shifts, complaints and the one who leaves staff.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Owner, the budget and not cutting breakfast.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incident, the VIP and the one who floods the room.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The inspection, insurance and not dressing the log.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That the house runs, and breakfast standing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • occupancy
  • hotel forecast
  • shifts
  • complaints
  • VIP
  • breakfast
  • inspection
  • rates

Sources for this job· O*NET 11-9081.00· ESCO/ISCO 1411

Analyse my job

Jobs with similar scores

  1. 612Caregiver16%
  2. 613Formwork carpenter16%
  3. 614Stevedore16%
  4. 616Miner16%
  5. 617Scaffolder16%
  6. 618Baker16%