IS WORK OVER?

Automation index

How much of a Crane operator’s job can AI already do?

A lift plan comes earlier. Raising a beam and not hitting anyone does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lift plan, radii and weights.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Run the crane and place the load.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Signals, wind and exclusion zone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, foreman and maintenance.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, inspections and machine tests.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a load over someone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Lift plan, radii and weights
  • Run the crane and place the load
  • Signals, wind and exclusion zone
  • Site, foreman and maintenance
  • Logs, inspections and machine tests
  • Not leaving a load over someone
  • gruista
  • operador de grua
  • crane operator

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Piling operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and each pile’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, bore and refusal.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cage, pour and the tube that rides up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vibration, the neighbour and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Plant, access and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
To level, and not cracking party walls.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive piles
  • bore
  • cages
  • refusal level
  • site vibration
  • pour piles
  • piling set-out
  • recoverable tubes

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 602Caregiver16%
  2. 603Formwork carpenter16%
  3. 604Stevedore16%
  4. 606Miner16%
  5. 607Scaffolder16%
  6. 608Baker16%