IS WORK OVER?

Automation index

How much of a Crane operator’s job can AI already do?

A lift plan comes earlier. Raising a beam and not hitting anyone does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lift plan, radii and weights.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Run the crane and place the load.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Signals, wind and exclusion zone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, foreman and maintenance.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, inspections and machine tests.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a load over someone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Lift plan, radii and weights
  • Run the crane and place the load
  • Signals, wind and exclusion zone
  • Site, foreman and maintenance
  • Logs, inspections and machine tests
  • Not leaving a load over someone
  • gruista
  • operador de grua
  • crane operator

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Tow-truck driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Call, route and the vehicle type.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Hard shoulder, hook and traffic that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Hydraulics, bed and the low car that scrapes.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Garage, the note and the client who argues.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Night, rain and not becoming the next crash.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not making the crash worse, and signing the hook.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hook vehicles
  • hard shoulder
  • the bed
  • recovery calls
  • crane hydraulics
  • recovery notes
  • traffic
  • low cars

Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332

Analyse my job

Jobs with similar scores

  1. 612Caregiver16%
  2. 613Formwork carpenter16%
  3. 614Stevedore16%
  4. 616Miner16%
  5. 617Scaffolder16%
  6. 618Baker16%