IS WORK OVER?

Automation index

How much of a Crane operator’s job can AI already do?

A lift plan comes earlier. Raising a beam and not hitting anyone does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Lift plan, radii and weights.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Run the crane and place the load.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Signals, wind and exclusion zone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, foreman and maintenance.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, inspections and machine tests.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a load over someone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Lift plan, radii and weights
  • Run the crane and place the load
  • Signals, wind and exclusion zone
  • Site, foreman and maintenance
  • Logs, inspections and machine tests
  • Not leaving a load over someone
  • gruista
  • operador de grua
  • crane operator

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Voice actor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Takes, lipsync and a first tweak.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Perform in the booth and hold takes.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Director, take and not fighting the line.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Voice, care and shouting days.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Diary, agents and life between studios.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not leaving a take that does not match the mouth.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Takes, lipsync and a first tweak
  • Perform in the booth and hold takes
  • Director, take and not fighting the line
  • Voice, care and shouting days
  • Diary, agents and life between studios
  • doblador
  • dobladora
  • voice actor

Sources for this job· O*NET 27-2011.00· ESCO/ISCO 2655

Analyse my job

Jobs with similar scores

  1. 612Caregiver16%
  2. 613Formwork carpenter16%
  3. 614Stevedore16%
  4. 616Miner16%
  5. 617Scaffolder16%
  6. 618Baker16%