IS WORK OVER?

Automation index

How much of a Curriculum designer’s job can AI already do?

A sequence comes earlier. It being teachable in a real classroom without dying in the PDF do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Curriculum designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sequence, criteria and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Pilot classroom, the teacher and what will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Rubric, the marker and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Review, inspection and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The publisher, the deadline and not swallowing a cut.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be taught, and not dying in the PDF.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • teaching sequences
  • criteria
  • rubrics
  • pilot classrooms
  • curriculum kit
  • inspection
  • publishers
  • dead PDF

Sources for this job· O*NET 25-9031.00· ESCO/ISCO 2351

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 154Spa manager27%
  2. 155Thesis supervisor27%
  3. 156Sporting director27%
  4. 158Instructional designer27%
  5. 159Personal trainer27%
  6. 160Writer27%