IS WORK OVER?

Automation index

How much of a Data engineer’s job can AI already do?

A pipeline and a diagram sketch. Keeping it up at 3 a.m., with PII and a four-hour job, does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Data engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design pipelines, models and orchestration.
Estimate

No public source provides a precise figure. This is our estimate.

24%50%+12
Write SQL, Spark and data tests.
Estimate

No public source provides a precise figure. This is our estimate.

18%45%+8.1
Incidents, quality and lineage in production.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to analysts and negotiate data contracts.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Cloud cost, permissions and PII.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Decide architecture and technical debt.
Estimate

No public source provides a precise figure. This is our estimate.

12%20%+2.4
Total100%31%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design pipelines, models and orchestration
  • Write SQL, Spark and data tests
  • Cloud cost, permissions and PII
  • Decide architecture and technical debt
  • ingeniero de datos
  • data engineer
  • etl

Sources for this job· O*NET 15-1243.00· ESCO/ISCO 2511

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 33Information specialist31%
  2. 34Epidemiologist31%
  3. 35Growth manager31%
  4. 37Product manager31%
  5. 38Junior developer31%
  6. 39Radiologist31%