IS WORK OVER?

Automation index

How much of a Data engineer’s job can AI already do?

A pipeline and a diagram sketch. Keeping it up at 3 a.m., with PII and a four-hour job, does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Data engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design pipelines, models and orchestration.
Estimate

No public source provides a precise figure. This is our estimate.

24%50%+12
Write SQL, Spark and data tests.
Estimate

No public source provides a precise figure. This is our estimate.

18%45%+8.1
Incidents, quality and lineage in production.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to analysts and negotiate data contracts.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Cloud cost, permissions and PII.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Decide architecture and technical debt.
Estimate

No public source provides a precise figure. This is our estimate.

12%20%+2.4
Total100%31%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design pipelines, models and orchestration
  • Write SQL, Spark and data tests
  • Cloud cost, permissions and PII
  • Decide architecture and technical debt
  • ingeniero de datos
  • data engineer
  • etl

Sources for this job· O*NET 15-1243.00· ESCO/ISCO 2511

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

Analyse my job

Jobs with similar scores

  1. 33Information specialist31%
  2. 34Epidemiologist31%
  3. 35Growth manager31%
  4. 37Product manager31%
  5. 38Junior developer31%
  6. 39Radiologist31%