Automation index
How much of a Data engineer’s job can AI already do?
A pipeline and a diagram sketch. Keeping it up at 3 a.m., with PII and a four-hour job, does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Data engineer
31%
AI can already do 31% of this job.
#36 / 623
View rankingData engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design pipelines, models and orchestration.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 50% | +12 |
Write SQL, Spark and data tests.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 45% | +8.1 |
Incidents, quality and lineage in production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Talk to analysts and negotiate data contracts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Cloud cost, permissions and PII.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
Decide architecture and technical debt.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 20% | +2.4 |
| Total | 100% | 31% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Design pipelines, models and orchestration
- Write SQL, Spark and data tests
- Cloud cost, permissions and PII
- Decide architecture and technical debt
- ingeniero de datos
- data engineer
- etl
Sources for this job· O*NET 15-1243.00· ESCO/ISCO 2511
IS WORK OVER?
Treasurer
27%
#189 / 623
View rankingTreasurer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Cash, forecast and the maturities.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Banks, facilities and the one that does not land.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Payments, the supplier and the one that waits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Board, the report and not dressing cash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The crunch, confirming and not hiding the hole.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Liquidity on Friday, and not lying to the bank.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cash forecast
- maturities
- facilities
- supplier payments
- confirming
- liquidity
- banks
- board report
Sources for this job· O*NET 11-3031.00· ESCO/ISCO 1211