IS WORK OVER?

Automation index

How much of a Data protection inspector’s job can AI already do?

A notice comes earlier. Walking into the file without leaving the data lying around do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Data protection inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Notice, the file and the deadline.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Inspection, the processing and what is not there.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Breach, the notice and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fine, the test and not hunting the sole trader extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The director, the note and not leaking the file.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Walk into the file, and not leaving the data lying around.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • files
  • processing
  • breaches
  • notices
  • data fines
  • AEPD deadlines
  • sole traders
  • not leak files

Sources for this job· O*NET 13-1041.00· ESCO/ISCO 2422

Corrosion engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Thicknesses, the map and the coupon.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the pipe and the one that is thin.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Cathode, the protection and the one that will not take.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Shutdown, the coating and not painting over rust.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Operations, the rush and not leaving the thin one in service.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop before it goes, and not painting over it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • thicknesses
  • corrosion maps
  • cathodic protection
  • coatings
  • thin pipes
  • shutdowns
  • rust
  • coupons

Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145

Analyse my job

Jobs with similar scores

  1. 181Textile engineer27%
  2. 182Immunologist27%
  3. 183Schools inspector27%
  4. 185Key account manager27%
  5. 186Linguist27%
  6. 187Magistrate27%