IS WORK OVER?

Automation index

How much of a Data protection inspector’s job can AI already do?

A notice comes earlier. Walking into the file without leaving the data lying around do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Data protection inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Notice, the file and the deadline.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Inspection, the processing and what is not there.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Breach, the notice and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fine, the test and not hunting the sole trader extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The director, the note and not leaking the file.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Walk into the file, and not leaving the data lying around.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • files
  • processing
  • breaches
  • notices
  • data fines
  • AEPD deadlines
  • sole traders
  • not leak files

Sources for this job· O*NET 13-1041.00· ESCO/ISCO 2422

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 184Textile engineer27%
  2. 185Immunologist27%
  3. 186Schools inspector27%
  4. 188Key account manager27%
  5. 189Linguist27%
  6. 190Magistrate27%