IS WORK OVER?

Automation index

How much of a Data protection inspector’s job can AI already do?

A notice comes earlier. Walking into the file without leaving the data lying around do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Data protection inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Notice, the file and the deadline.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Inspection, the processing and what is not there.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Breach, the notice and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fine, the test and not hunting the sole trader extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The director, the note and not leaking the file.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Walk into the file, and not leaving the data lying around.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • files
  • processing
  • breaches
  • notices
  • data fines
  • AEPD deadlines
  • sole traders
  • not leak files

Sources for this job· O*NET 13-1041.00· ESCO/ISCO 2422

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 180Textile engineer27%
  2. 181Immunologist27%
  3. 182Schools inspector27%
  4. 184Key account manager27%
  5. 185Linguist27%
  6. 186Magistrate27%