Automation index
How much of a Data protection officer’s job can AI already do?
A processing record and a clause come earlier. Calling an incident and answering the regulator do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Data protection officer
29%
AI can already do 29% of this job.
#58 / 733
View rankingData protection officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Processing records, clauses and DPIAs.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Policies, processor contracts and transfers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Data-subject rights, internal queries and training.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Incidents, notification and the call to the regulator.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Vendors, cookies and new processing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Independence, board report and liability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- data protection
- apply GDPR
- run DPIAs
- handle subject rights
- notify breaches
- draft clauses
- processor contracts
- answer the regulator
Sources for this job· O*NET 13-1041.00· ESCO/ISCO 2422
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142