IS WORK OVER?

Automation index

How much of a Demand planner’s job can AI already do?

A forecast comes earlier. Neither an empty shelf nor a drowned warehouse do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Demand planner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Forecast, promotions and bias.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Safety stock, lead time and the order.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Sales, the spike and the promo nobody flagged.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
S&OP, consensus and the fight over numbers.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The supplier who fails and not covering with air.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Neither empty nor drowned, and not inflating the forecast.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • demand forecast
  • safety stock
  • lead time
  • S&OP
  • promotions
  • forecast bias
  • supplier orders
  • empty shelf

Sources for this job· O*NET 13-1081.00· ESCO/ISCO 2421

Aerospace engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, simulate and certify structures and systems.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bench, test flight and incidents.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vendors, quality and EASA.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versions and configuration.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign something that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, tolerances and traceability
  • Bench, test flight and incidents
  • Vendors, quality and EASA
  • Documentation, versions and configuration
  • Sign something that will not fall
  • ingeniero aeronautico
  • aerospace engineer

Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 108Mathematician28%
  2. 109BIM modeller28%
  3. 110Notary clerk28%
  4. 112Route planner28%
  5. 113Psychologist28%
  6. 114Parts clerk28%