IS WORK OVER?

Automation index

How much of a Demolition worker’s job can AI already do?

A demolition plan comes earlier. Bringing it down without taking the party wall or anyone do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Demolition worker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, asbestos and prior removal.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Demolish, cut and the controlled push.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Party wall, shore and the neighbour who complains.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Waste, sorting and the tip.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Dust, water and not leaving the street a site.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not taking the party wall, and signing the takedown.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • demolish
  • remove asbestos
  • shore party walls
  • sort waste
  • controlled cut
  • demolition dust
  • the tip
  • controlled push

Sources for this job· O*NET 47-2061.00· ESCO/ISCO 7112

Arborist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Assess, risk and the owner’s report.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, prune and the anchor.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Controlled fell and the one over the cable.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Arisings, chipping and leaving it clean.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The neighbour, the permit and not entering their plot.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not dropping it on the roof, and coming down whole.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • crown work
  • climb
  • controlled fell
  • risk report
  • anchors
  • chipping
  • cables
  • felling permits

Sources for this job· O*NET 37-3013.00· ESCO/ISCO 6113

Analyse my job

Jobs with similar scores

  1. 525Mosaicist19%
  2. 526Neurosurgeon19%
  3. 527Power-plant operator19%
  4. 529Wastewater-plant operator19%
  5. 530Concrete finisher19%
  6. 531Piling operator19%