Automation index
How much of a Demolition worker’s job can AI already do?
A demolition plan comes earlier. Bringing it down without taking the party wall or anyone do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Demolition worker
19%
AI can already do 19% of this job.
#625 / 753
View rankingDemolition worker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, asbestos and prior removal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Demolish, cut and the controlled push.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Party wall, shore and the neighbour who complains.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Waste, sorting and the tip.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Dust, water and not leaving the street a site.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not taking the party wall, and signing the takedown.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- demolish
- remove asbestos
- shore party walls
- sort waste
- controlled cut
- demolition dust
- the tip
- controlled push
Sources for this job· O*NET 47-2061.00· ESCO/ISCO 7112
IS WORK OVER?
CAD designer
27%
#204 / 753
View rankingCAD designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, dimensions and the drawing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Clash, the hit and not leaving it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
List, the material and the one that does not exist.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Change, the revision and not losing the native.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The shop, the doubt and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it can be made, and not leaving the clash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- 3D models
- dimensions
- clashes
- bills of materials
- revisions
- shop drawings
- natives
- hits
Sources for this job· O*NET 17-3013.00· ESCO/ISCO 3118