Automation index
How much of a Demolition worker’s job can AI already do?
A demolition plan comes earlier. Bringing it down without taking the party wall or anyone do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Demolition worker
19%
AI can already do 19% of this job.
#625 / 753
View rankingDemolition worker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, asbestos and prior removal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Demolish, cut and the controlled push.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Party wall, shore and the neighbour who complains.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Waste, sorting and the tip.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Dust, water and not leaving the street a site.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not taking the party wall, and signing the takedown.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- demolish
- remove asbestos
- shore party walls
- sort waste
- controlled cut
- demolition dust
- the tip
- controlled push
Sources for this job· O*NET 47-2061.00· ESCO/ISCO 7112
IS WORK OVER?
Corrosion engineer
22%
#390 / 753
View rankingCorrosion engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Thicknesses, the map and the coupon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the pipe and the one that is thin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Cathode, the protection and the one that will not take.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shutdown, the coating and not painting over rust.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the rush and not leaving the thin one in service.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Stop before it goes, and not painting over it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- thicknesses
- corrosion maps
- cathodic protection
- coatings
- thin pipes
- shutdowns
- rust
- coupons
Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145