IS WORK OVER?

Automation index

How much of a Demolition worker’s job can AI already do?

A demolition plan comes earlier. Bringing it down without taking the party wall or anyone do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Demolition worker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, asbestos and prior removal.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Demolish, cut and the controlled push.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Party wall, shore and the neighbour who complains.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Waste, sorting and the tip.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Dust, water and not leaving the street a site.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not taking the party wall, and signing the takedown.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • demolish
  • remove asbestos
  • shore party walls
  • sort waste
  • controlled cut
  • demolition dust
  • the tip
  • controlled push

Sources for this job· O*NET 47-2061.00· ESCO/ISCO 7112

Hydrologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hydrograph, catchment and the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, gauging and the one that does not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Flood, the alert and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Low flow, irrigation and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The authority, the figure and not dressing the flow.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If the river rises, call it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hydrographs
  • catchments
  • gauging
  • floods
  • low flow
  • hydrology alerts
  • flows
  • the river authority

Sources for this job· O*NET 19-2043.00· ESCO/ISCO 2114

Analyse my job

Jobs with similar scores

  1. 515Mosaicist19%
  2. 516Neurosurgeon19%
  3. 517Power-plant operator19%
  4. 519Wastewater-plant operator19%
  5. 520Concrete finisher19%
  6. 521Piling operator19%