IS WORK OVER?

Automation index

How much of a Demolition worker’s job can AI already do?

A demolition plan comes earlier. Bringing it down without taking the party wall or anyone do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Demolition worker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, asbestos and prior removal.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Demolish, cut and the controlled push.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Party wall, shore and the neighbour who complains.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Waste, sorting and the tip.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Dust, water and not leaving the street a site.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not taking the party wall, and signing the takedown.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • demolish
  • remove asbestos
  • shore party walls
  • sort waste
  • controlled cut
  • demolition dust
  • the tip
  • controlled push

Sources for this job· O*NET 47-2061.00· ESCO/ISCO 7112

Kayak guide

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, kit and the briefing.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Water, the novice and the one who flips.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Rescue, the rope and not losing anyone.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rapid, the yes or no and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The cold, the wetsuit and not pushing the grade.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Without flipping the group, and whole to the take-out.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • flow
  • river rescue
  • rapids
  • wetsuit
  • kayak novices
  • rope
  • river briefing
  • flip

Sources for this job· O*NET 39-7011.00· ESCO/ISCO 5113

Analyse my job

Jobs with similar scores

  1. 515Mosaicist19%
  2. 516Neurosurgeon19%
  3. 517Power-plant operator19%
  4. 519Wastewater-plant operator19%
  5. 520Concrete finisher19%
  6. 521Piling operator19%