IS WORK OVER?

Automation index

How much of a Demolition worker’s job can AI already do?

A demolition plan comes earlier. Bringing it down without taking the party wall or anyone do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Demolition worker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, asbestos and prior removal.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Demolish, cut and the controlled push.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Party wall, shore and the neighbour who complains.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Waste, sorting and the tip.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Dust, water and not leaving the street a site.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not taking the party wall, and signing the takedown.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • demolish
  • remove asbestos
  • shore party walls
  • sort waste
  • controlled cut
  • demolition dust
  • the tip
  • controlled push

Sources for this job· O*NET 47-2061.00· ESCO/ISCO 7112

Operating room nurse

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set the table, checklist and the patient card.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Scrub, anticipate and not break the field.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Count swabs, needles and the record.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Circulate, stocks and the turnaround.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Emergency, the bleeder and the table change.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Nothing left inside and signing the count.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • scrub
  • surgical checklist
  • swab count
  • set the table
  • circulate
  • sterile field
  • theatre
  • anticipate the surgeon

Sources for this job· O*NET 29-1141.00· ESCO/ISCO 2221

Analyse my job

Jobs with similar scores

  1. 525Mosaicist19%
  2. 526Neurosurgeon19%
  3. 527Power-plant operator19%
  4. 529Wastewater-plant operator19%
  5. 530Concrete finisher19%
  6. 531Piling operator19%