IS WORK OVER?

Automation index

How much of a Demolition worker’s job can AI already do?

A demolition plan comes earlier. Bringing it down without taking the party wall or anyone do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Demolition worker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, asbestos and prior removal.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Demolish, cut and the controlled push.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Party wall, shore and the neighbour who complains.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Waste, sorting and the tip.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Dust, water and not leaving the street a site.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not taking the party wall, and signing the takedown.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • demolish
  • remove asbestos
  • shore party walls
  • sort waste
  • controlled cut
  • demolition dust
  • the tip
  • controlled push

Sources for this job· O*NET 47-2061.00· ESCO/ISCO 7112

Power engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Study, the short-circuit and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Substation, the disconnector and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Switching, the five rules and not skipping them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fault, the relay and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not blow, and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • short-circuits
  • selectivity
  • disconnectors
  • five rules
  • relays
  • substations
  • lockouts
  • not work live

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Analyse my job

Jobs with similar scores

  1. 622Neurosurgeon19%
  2. 623Judicial police officer19%
  3. 624Power-plant operator19%
  4. 626Wastewater-plant operator19%
  5. 627Concrete finisher19%
  6. 628Piling operator19%