IS WORK OVER?

Automation index

How much of a Demolition worker’s job can AI already do?

A demolition plan comes earlier. Bringing it down without taking the party wall or anyone do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Demolition worker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, asbestos and prior removal.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Demolish, cut and the controlled push.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Party wall, shore and the neighbour who complains.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Waste, sorting and the tip.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Dust, water and not leaving the street a site.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not taking the party wall, and signing the takedown.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • demolish
  • remove asbestos
  • shore party walls
  • sort waste
  • controlled cut
  • demolition dust
  • the tip
  • controlled push

Sources for this job· O*NET 47-2061.00· ESCO/ISCO 7112

Residential porter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Shift, the sheet and the letterboxes.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hall, the neighbour and the one who is not.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fault, the water and calling it in.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Move, the lift and not scratching.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The residents, the complaint and not taking sides.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Be there when it floods, and not losing the master.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fault sheets
  • master key
  • the hall
  • letterboxes
  • floods
  • moves
  • the residents
  • not take sides

Sources for this job· O*NET 39-6012.00· ESCO/ISCO 9629

Analyse my job

Jobs with similar scores

  1. 584Mosaicist19%
  2. 585Neurosurgeon19%
  3. 586Power-plant operator19%
  4. 588Wastewater-plant operator19%
  5. 589Concrete finisher19%
  6. 590Piling operator19%