IS WORK OVER?

Automation index

How much of a Demolition worker’s job can AI already do?

A demolition plan comes earlier. Bringing it down without taking the party wall or anyone do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Demolition worker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, asbestos and prior removal.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Demolish, cut and the controlled push.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Party wall, shore and the neighbour who complains.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Waste, sorting and the tip.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Dust, water and not leaving the street a site.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not taking the party wall, and signing the takedown.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • demolish
  • remove asbestos
  • shore party walls
  • sort waste
  • controlled cut
  • demolition dust
  • the tip
  • controlled push

Sources for this job· O*NET 47-2061.00· ESCO/ISCO 7112

Tunnel engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Heading, the geology and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Water, the inflow and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Blast, the vibration and the building.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Segment, the ring and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not come down, and not hiding the water.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tunnel headings
  • support
  • inflows
  • blasts
  • segments
  • tunnel geology
  • rings
  • vibrations

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 642Neurosurgeon19%
  2. 643Judicial police officer19%
  3. 644Power-plant operator19%
  4. 646Wastewater-plant operator19%
  5. 647Concrete finisher19%
  6. 648Piling operator19%