Automation index
How much of a Dialysis nurse’s job can AI already do?
A session protocol comes earlier. Needling the fistula and finishing the run do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Dialysis nurse
21%
AI can already do 21% of this job.
#425 / 643
View rankingDialysis nurse
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Weigh, set ultrafiltration and the circuit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Needle the fistula, connect and watch the run.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Hypotension, cramps and the one who feels ill.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Educate, diet and the access that underperforms.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shifts, machines and cleaning the monitor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No clotting and signing the session.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- needle fistulas
- dialysis session
- ultrafiltration
- connect the machine
- dialysis education
- intradialytic hypotension
- vascular access
- clean the monitor
Sources for this job· O*NET 29-1141.00· ESCO/ISCO 2221
IS WORK OVER?
Building surveyor
22%
#326 / 643
View rankingBuilding surveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Quantities, valuations and cost control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Working drawings and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, visits and safety.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Client, contractor and site team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, tests and the building book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a build that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Quantities, valuations and cost control
- Working drawings and trade coordination
- Site, visits and safety
- Client, contractor and site team
- Quality, tests and the building book
- Sign a build that will not fall
- arquitecto tecnico
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112