IS WORK OVER?

Automation index

How much of a Dialysis nurse’s job can AI already do?

A session protocol comes earlier. Needling the fistula and finishing the run do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Dialysis nurse

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Weigh, set ultrafiltration and the circuit.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Needle the fistula, connect and watch the run.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Hypotension, cramps and the one who feels ill.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Educate, diet and the access that underperforms.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Shifts, machines and cleaning the monitor.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No clotting and signing the session.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • needle fistulas
  • dialysis session
  • ultrafiltration
  • connect the machine
  • dialysis education
  • intradialytic hypotension
  • vascular access
  • clean the monitor

Sources for this job· O*NET 29-1141.00· ESCO/ISCO 2221

Geological engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Boreholes, lab and the geotech profile.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Field, outcrop and what the map misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Foundations, slopes and the risk report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Tunnel, water and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The works that move, and stop or go.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Call the ground, and sign the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • geotech profile
  • foundations
  • slopes
  • tunnel support
  • outcrops
  • geological risk
  • ground reports

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 413Animal breeder21%
  2. 414Youth educator21%
  3. 415Prison educator21%
  4. 417Driving examiner21%
  5. 418Façade technician21%
  6. 419Physiotherapist21%