Automation index
How much of a Dialysis nurse’s job can AI already do?
A session protocol comes earlier. Needling the fistula and finishing the run do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Dialysis nurse
21%
AI can already do 21% of this job.
#504 / 743
View rankingDialysis nurse
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Weigh, set ultrafiltration and the circuit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Needle the fistula, connect and watch the run.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Hypotension, cramps and the one who feels ill.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Educate, diet and the access that underperforms.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shifts, machines and cleaning the monitor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No clotting and signing the session.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- needle fistulas
- dialysis session
- ultrafiltration
- connect the machine
- dialysis education
- intradialytic hypotension
- vascular access
- clean the monitor
Sources for this job· O*NET 29-1141.00· ESCO/ISCO 2221
IS WORK OVER?
Power engineer
22%
#395 / 743
View rankingPower engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Study, the short-circuit and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Substation, the disconnector and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Switching, the five rules and not skipping them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fault, the relay and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not blow, and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- short-circuits
- selectivity
- disconnectors
- five rules
- relays
- substations
- lockouts
- not work live
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151