Automation index
How much of a Dialysis nurse’s job can AI already do?
A session protocol comes earlier. Needling the fistula and finishing the run do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Dialysis nurse
21%
AI can already do 21% of this job.
#416 / 633
View rankingDialysis nurse
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Weigh, set ultrafiltration and the circuit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Needle the fistula, connect and watch the run.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Hypotension, cramps and the one who feels ill.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Educate, diet and the access that underperforms.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shifts, machines and cleaning the monitor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No clotting and signing the session.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- needle fistulas
- dialysis session
- ultrafiltration
- connect the machine
- dialysis education
- intradialytic hypotension
- vascular access
- clean the monitor
Sources for this job· O*NET 29-1141.00· ESCO/ISCO 2221
IS WORK OVER?
Power-plant operator
19%
#517 / 633
View rankingPower-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-point, parameters and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Room, alarms and the one that trips.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Start, stop and not skipping the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, isolation and the permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the grid and not forcing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The set-point, and not tripping.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set-points
- control room
- plant SOP
- starts
- isolations
- alarms
- dispatch
- the grid
Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131