Automation index
How much of a Dialysis nurse’s job can AI already do?
A session protocol comes earlier. Needling the fistula and finishing the run do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Dialysis nurse
21%
AI can already do 21% of this job.
#425 / 643
View rankingDialysis nurse
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Weigh, set ultrafiltration and the circuit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Needle the fistula, connect and watch the run.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Hypotension, cramps and the one who feels ill.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Educate, diet and the access that underperforms.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shifts, machines and cleaning the monitor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No clotting and signing the session.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- needle fistulas
- dialysis session
- ultrafiltration
- connect the machine
- dialysis education
- intradialytic hypotension
- vascular access
- clean the monitor
Sources for this job· O*NET 29-1141.00· ESCO/ISCO 2221
IS WORK OVER?
Tower crane operator
18%
#583 / 643
View rankingTower crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Radius, winds and the day’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, trolley and the slinger’s call.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Erect, climb and the base that is checked.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Two-crane lifts and crossing jibs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wind that gets up and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sweep nobody, and not pushing the radius.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tower-crane lifts
- load charts
- climb the crane
- slinger’s call
- jib wind
- crossing jibs
- crane base
- trolley
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343