Automation index
How much of a District heating engineer’s job can AI already do?
A heat balance comes earlier. Heat reaching the last block without hiding the loss do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
District heating engineer
22%
AI can already do 22% of this job.
#398 / 753
View rankingDistrict heating engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Balance, flows and the loss.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Chamber, the leak and the one that weeps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Substation, the valve and the one that will not open.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Winter, the last block and not leaving it cold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the tariff and not hiding the loss.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the heat arrives, and not hiding the loss.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- heat balances
- flows
- network losses
- chambers
- heat substations
- the last block
- tariffs
- leaks
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149
IS WORK OVER?
CAD designer
27%
#204 / 753
View rankingCAD designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, dimensions and the drawing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Clash, the hit and not leaving it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
List, the material and the one that does not exist.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Change, the revision and not losing the native.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The shop, the doubt and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it can be made, and not leaving the clash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- 3D models
- dimensions
- clashes
- bills of materials
- revisions
- shop drawings
- natives
- hits
Sources for this job· O*NET 17-3013.00· ESCO/ISCO 3118