IS WORK OVER?

Automation index

How much of a Diving instructor’s job can AI already do?

A dive briefing comes earlier. Coming up whole without forgetting to breathe do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Diving instructor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Briefing, tables and the plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Water, the student and the one who panics.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Drills, the regulator and the one who is out of air.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Log, certification and not giving the star away.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The current, the vis and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come up whole, and not skipping the stop.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dive briefing
  • tables
  • regulator
  • certify divers
  • current
  • visibility
  • stops
  • nervous students

Sources for this job· O*NET 25-3021.00· ESCO/ISCO 3422

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 606Site engineer19%
  2. 607Shutter installer19%
  3. 608Window installer19%
  4. 610Climbing instructor19%
  5. 611Restaurant maître19%
  6. 612Judge19%