Automation index
How much of a Diving instructor’s job can AI already do?
A dive briefing comes earlier. Coming up whole without forgetting to breathe do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Diving instructor
19%
AI can already do 19% of this job.
#601 / 743
View rankingDiving instructor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Briefing, tables and the plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Water, the student and the one who panics.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Drills, the regulator and the one who is out of air.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Log, certification and not giving the star away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The current, the vis and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come up whole, and not skipping the stop.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dive briefing
- tables
- regulator
- certify divers
- current
- visibility
- stops
- nervous students
Sources for this job· O*NET 25-3021.00· ESCO/ISCO 3422
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142