IS WORK OVER?

Automation index

How much of a Diving instructor’s job can AI already do?

A dive briefing comes earlier. Coming up whole without forgetting to breathe do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Diving instructor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Briefing, tables and the plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Water, the student and the one who panics.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Drills, the regulator and the one who is out of air.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Log, certification and not giving the star away.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The current, the vis and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come up whole, and not skipping the stop.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dive briefing
  • tables
  • regulator
  • certify divers
  • current
  • visibility
  • stops
  • nervous students

Sources for this job· O*NET 25-3021.00· ESCO/ISCO 3422

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 598Site engineer19%
  2. 599Shutter installer19%
  3. 600Window installer19%
  4. 602Climbing instructor19%
  5. 603Restaurant maître19%
  6. 604Judge19%