Automation index
How much of a Dog trainer’s job can AI already do?
A plan and a video come earlier. A dog that does not bite, and an owner who gets it, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Dog trainer
18%
AI can already do 18% of this job.
#660 / 743
View rankingDog trainer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Assess, plan and dog charts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Sessions, lead and reading the animal.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Train the owner, not just the dog.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Groups, reactivity and safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Premises, kennels and hygiene.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not leaving a dangerous dog in a home.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Assess, plan and dog charts
- Sessions, lead and reading the animal
- Train the owner, not just the dog
- Groups, reactivity and safety
- Premises, kennels and hygiene
- Not leaving a dangerous dog in a home
- adiestrador
- educador canino
- dog trainer
Sources for this job· O*NET 39-2011.00· ESCO/ISCO 5164
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142