Automation index
How much of a Dog trainer’s job can AI already do?
A plan and a video come earlier. A dog that does not bite, and an owner who gets it, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Dog trainer
18%
AI can already do 18% of this job.
#660 / 743
View rankingDog trainer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Assess, plan and dog charts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Sessions, lead and reading the animal.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Train the owner, not just the dog.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Groups, reactivity and safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Premises, kennels and hygiene.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not leaving a dangerous dog in a home.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Assess, plan and dog charts
- Sessions, lead and reading the animal
- Train the owner, not just the dog
- Groups, reactivity and safety
- Premises, kennels and hygiene
- Not leaving a dangerous dog in a home
- adiestrador
- educador canino
- dog trainer
Sources for this job· O*NET 39-2011.00· ESCO/ISCO 5164
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142