IS WORK OVER?

Automation index

How much of a Dog trainer’s job can AI already do?

A plan and a video come earlier. A dog that does not bite, and an owner who gets it, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Dog trainer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Assess, plan and dog charts.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Sessions, lead and reading the animal.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Train the owner, not just the dog.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Groups, reactivity and safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Premises, kennels and hygiene.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not leaving a dangerous dog in a home.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Assess, plan and dog charts
  • Sessions, lead and reading the animal
  • Train the owner, not just the dog
  • Groups, reactivity and safety
  • Premises, kennels and hygiene
  • Not leaving a dangerous dog in a home
  • adiestrador
  • educador canino
  • dog trainer

Sources for this job· O*NET 39-2011.00· ESCO/ISCO 5164

Tower crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Radius, winds and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, trolley and the slinger’s call.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Erect, climb and the base that is checked.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Two-crane lifts and crossing jibs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wind that gets up and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sweep nobody, and not pushing the radius.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tower-crane lifts
  • load charts
  • climb the crane
  • slinger’s call
  • jib wind
  • crossing jibs
  • crane base
  • trolley

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 557Glassblower19%
  2. 558Stained-glass artist19%
  3. 559Cobbler19%
  4. 561Forest ranger18%
  5. 562Aerial technician18%
  6. 563Varnisher18%