Automation index
How much of a Doula’s job can AI already do?
A birth plan comes earlier. Being in the delivery room without replacing the midwife do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Doula
19%
AI can already do 19% of this job.
#592 / 753
View rankingDoula
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, expectations and what cannot be.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Labour, the house and the one that runs long.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Delivery room, the position and the one who asks for an epidural.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Puerperium, the breast and the come-down.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The midwife, the line and not playing clinician.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Be there, and not replacing the midwife.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- birth plan
- labour support
- puerperium
- breastfeeding
- positions
- delivery room
- not replace the midwife
- expectations
Sources for this job· O*NET 31-9099.00· ESCO/ISCO 5322
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165