Automation index
How much of a Doula’s job can AI already do?
A birth plan comes earlier. Being in the delivery room without replacing the midwife do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Doula
19%
AI can already do 19% of this job.
#612 / 773
View rankingDoula
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, expectations and what cannot be.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Labour, the house and the one that runs long.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Delivery room, the position and the one who asks for an epidural.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Puerperium, the breast and the come-down.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The midwife, the line and not playing clinician.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Be there, and not replacing the midwife.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- birth plan
- labour support
- puerperium
- breastfeeding
- positions
- delivery room
- not replace the midwife
- expectations
Sources for this job· O*NET 31-9099.00· ESCO/ISCO 5322
IS WORK OVER?
Tunnel engineer
22%
#420 / 773
View rankingTunnel engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Heading, the geology and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Water, the inflow and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Blast, the vibration and the building.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Segment, the ring and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not come down, and not hiding the water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tunnel headings
- support
- inflows
- blasts
- segments
- tunnel geology
- rings
- vibrations
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142