IS WORK OVER?

Automation index

How much of a Drafter’s job can AI already do?

A model and a sheet come earlier. A drawing you can actually build does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Drafter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimension and issue sheets.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Quantities, legends and revisions.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coordinate with architect, engineer and site.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drawing standards, stamps and issue.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Archive, BIM and clashes.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not issuing a drawing nobody can read.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model, dimension and issue sheets
  • Quantities, legends and revisions
  • Drawing standards, stamps and issue
  • Archive, BIM and clashes
  • Not issuing a drawing nobody can read
  • delineante
  • proyectista
  • drafter
  • cad technician

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Battery technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
BMS, SOH and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Module, the imbalance and the one that swells.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Shop, isolation and not shorting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Thermal, the fire and the protocol.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The vehicle, the warranty and not swapping blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No fire, and the module right.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BMS
  • SOH
  • modules
  • imbalance
  • swelling
  • isolation
  • thermal fire
  • battery warranty

Sources for this job· O*NET 17-3023.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 199Fundraiser26%
  2. 200Ship agent26%
  3. 201Financial controller26%
  4. 203Web developer26%
  5. 204Game designer26%
  6. 205Set designer26%