IS WORK OVER?

Automation index

How much of a Drafter’s job can AI already do?

A model and a sheet come earlier. A drawing you can actually build does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Drafter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimension and issue sheets.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Quantities, legends and revisions.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coordinate with architect, engineer and site.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drawing standards, stamps and issue.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Archive, BIM and clashes.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not issuing a drawing nobody can read.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model, dimension and issue sheets
  • Quantities, legends and revisions
  • Drawing standards, stamps and issue
  • Archive, BIM and clashes
  • Not issuing a drawing nobody can read
  • delineante
  • proyectista
  • drafter
  • cad technician

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Educational psychologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Assessment, tests and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Classroom, the teacher and what actually happens.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Family, the pushback and not blaming.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Adjustment, the resource and fighting for the place.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Staff, the label and not hanging it extra.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Change the classroom, and not labelling.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • needs reports
  • curriculum adjustments
  • psychopedagogical assessment
  • the classroom
  • staff meeting
  • SEN resources
  • the family
  • not label

Sources for this job· O*NET 19-3031.00· ESCO/ISCO 2634

Analyse my job

Jobs with similar scores

  1. 200Fundraiser26%
  2. 201Ship agent26%
  3. 202Financial controller26%
  4. 204Web developer26%
  5. 205Game designer26%
  6. 206Set designer26%