IS WORK OVER?

Automation index

How much of a Drafter’s job can AI already do?

A model and a sheet come earlier. A drawing you can actually build does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Drafter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimension and issue sheets.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Quantities, legends and revisions.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coordinate with architect, engineer and site.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drawing standards, stamps and issue.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Archive, BIM and clashes.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not issuing a drawing nobody can read.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model, dimension and issue sheets
  • Quantities, legends and revisions
  • Drawing standards, stamps and issue
  • Archive, BIM and clashes
  • Not issuing a drawing nobody can read
  • delineante
  • proyectista
  • drafter
  • cad technician

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Excavator operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, levels and the machine log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Dig, load and the batter that comes in.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Services, the blind pipe and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Maintenance, grease and the pin that snaps.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The labourer, the lorry and covering nobody.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Not breaking what is buried, and leaving a clean formation.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dig with excavator
  • load lorries
  • batters
  • buried services
  • set-out levels
  • grease the machine
  • formation
  • site GPS

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 8342

Analyse my job

Jobs with similar scores

  1. 194Fundraiser26%
  2. 195Ship agent26%
  3. 196Financial controller26%
  4. 198Web developer26%
  5. 199Game designer26%
  6. 200Set designer26%