IS WORK OVER?

Automation index

How much of a Drafter’s job can AI already do?

A model and a sheet come earlier. A drawing you can actually build does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Drafter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimension and issue sheets.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Quantities, legends and revisions.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coordinate with architect, engineer and site.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drawing standards, stamps and issue.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Archive, BIM and clashes.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not issuing a drawing nobody can read.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model, dimension and issue sheets
  • Quantities, legends and revisions
  • Drawing standards, stamps and issue
  • Archive, BIM and clashes
  • Not issuing a drawing nobody can read
  • delineante
  • proyectista
  • drafter
  • cad technician

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Makeup artist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Moodboards, lists and quotes.
Estimate

No public source provides a precise figure. This is our estimate.

16%38%+6.1
Bookings, consents and social.
Estimate

No public source provides a precise figure. This is our estimate.

14%28%+3.9
Make up, hair and retouch on set.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Difficult skin, allergies and sweat.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Talent, director and the clock.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Kit, hygiene and travel.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Moodboards, lists and quotes
  • Bookings, consents and social
  • Make up, hair and retouch on set
  • Difficult skin, allergies and sweat
  • Talent, director and the clock
  • Kit, hygiene and travel
  • maquillador
  • makeup artist
  • maquillaje

Sources for this job· O*NET 39-5091.00· ESCO/ISCO 5142

Analyse my job

Jobs with similar scores

  1. 194Fundraiser26%
  2. 195Ship agent26%
  3. 196Financial controller26%
  4. 198Web developer26%
  5. 199Game designer26%
  6. 200Set designer26%