IS WORK OVER?

Automation index

How much of a Drafter’s job can AI already do?

A model and a sheet come earlier. A drawing you can actually build does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Drafter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimension and issue sheets.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Quantities, legends and revisions.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coordinate with architect, engineer and site.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drawing standards, stamps and issue.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Archive, BIM and clashes.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not issuing a drawing nobody can read.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model, dimension and issue sheets
  • Quantities, legends and revisions
  • Drawing standards, stamps and issue
  • Archive, BIM and clashes
  • Not issuing a drawing nobody can read
  • delineante
  • proyectista
  • drafter
  • cad technician

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Marine engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Rounds, parameters and the engine log.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Breakdown, the sea and repairing with what you have.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Fuel, oils and the port change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Watch, alarms and the one who does not sleep.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Survey, class and not dressing the log.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Last the crossing, and not silencing the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • engine rounds
  • engine log
  • breakdowns at sea
  • watches
  • class
  • fuels
  • engine-room alarms
  • repair on passage

Sources for this job· O*NET 53-5031.00· ESCO/ISCO 3151

Analyse my job

Jobs with similar scores

  1. 194Fundraiser26%
  2. 195Ship agent26%
  3. 196Financial controller26%
  4. 198Web developer26%
  5. 199Game designer26%
  6. 200Set designer26%