Automation index
How much of a Drafter’s job can AI already do?
A model and a sheet come earlier. A drawing you can actually build does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Drafter
26%
AI can already do 26% of this job.
#197 / 633
View rankingDrafter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, dimension and issue sheets.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 48% | +9.6 |
Quantities, legends and revisions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Coordinate with architect, engineer and site.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drawing standards, stamps and issue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Archive, BIM and clashes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not issuing a drawing nobody can read.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model, dimension and issue sheets
- Quantities, legends and revisions
- Drawing standards, stamps and issue
- Archive, BIM and clashes
- Not issuing a drawing nobody can read
- delineante
- proyectista
- drafter
- cad technician
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118
IS WORK OVER?
Miner
16%
#606 / 633
View rankingMiner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, blast plans and sensors.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Logged maintenance and mine CMMS.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Drill, load and extract.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 10% | +2.4 |
Support, ventilation and water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, gases and evacuation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Shift, partner and not getting casual.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, blast plans and sensors
- Logged maintenance and mine CMMS
- Drill, load and extract
- Support, ventilation and water
- Safety, gases and evacuation
- Shift, partner and not getting casual
- minero
- miner
- interior de mina
Sources for this job· O*NET 47-5041.00· ESCO/ISCO 8111