Automation index
How much of a Drafter’s job can AI already do?
A model and a sheet come earlier. A drawing you can actually build does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Drafter
26%
AI can already do 26% of this job.
#197 / 623
View rankingDrafter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, dimension and issue sheets.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 48% | +9.6 |
Quantities, legends and revisions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Coordinate with architect, engineer and site.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drawing standards, stamps and issue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Archive, BIM and clashes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not issuing a drawing nobody can read.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model, dimension and issue sheets
- Quantities, legends and revisions
- Drawing standards, stamps and issue
- Archive, BIM and clashes
- Not issuing a drawing nobody can read
- delineante
- proyectista
- drafter
- cad technician
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118
IS WORK OVER?
Power-plant operator
19%
#512 / 623
View rankingPower-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-point, parameters and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Room, alarms and the one that trips.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Start, stop and not skipping the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, isolation and the permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the grid and not forcing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The set-point, and not tripping.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set-points
- control room
- plant SOP
- starts
- isolations
- alarms
- dispatch
- the grid
Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131