IS WORK OVER?

Automation index

How much of a Drafter’s job can AI already do?

A model and a sheet come earlier. A drawing you can actually build does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Drafter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimension and issue sheets.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Quantities, legends and revisions.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coordinate with architect, engineer and site.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drawing standards, stamps and issue.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Archive, BIM and clashes.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not issuing a drawing nobody can read.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model, dimension and issue sheets
  • Quantities, legends and revisions
  • Drawing standards, stamps and issue
  • Archive, BIM and clashes
  • Not issuing a drawing nobody can read
  • delineante
  • proyectista
  • drafter
  • cad technician

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Requirements engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Workshop, the actor and the requirement.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Conflict, the loudest and not swallowing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Criterion, the test and not leaving it vague.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the impact and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The project lead, the deadline and not cutting the one that matters.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it is needed, and not the loudest one's.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • requirements
  • actor workshops
  • acceptance criteria
  • change impact
  • backlog
  • tests
  • not swallow the loudest
  • ambiguity

Sources for this job· O*NET 15-1299.00· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 233Fundraiser26%
  2. 234Ship agent26%
  3. 235Financial controller26%
  4. 237Web developer26%
  5. 238Game designer26%
  6. 239Set designer26%