IS WORK OVER?

Automation index

How much of a Drafter’s job can AI already do?

A model and a sheet come earlier. A drawing you can actually build does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Drafter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimension and issue sheets.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Quantities, legends and revisions.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coordinate with architect, engineer and site.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drawing standards, stamps and issue.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Archive, BIM and clashes.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not issuing a drawing nobody can read.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model, dimension and issue sheets
  • Quantities, legends and revisions
  • Drawing standards, stamps and issue
  • Archive, BIM and clashes
  • Not issuing a drawing nobody can read
  • delineante
  • proyectista
  • drafter
  • cad technician

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Sailor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Log, checklists and paper watches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Charts, weather and passage planning.
Estimate

No public source provides a precise figure. This is our estimate.

14%25%+3.5
Deck, lines, cargo and upkeep.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Watch, helm and lookout.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Emergencies, abandon ship and fire.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Life aboard, ports and fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Log, checklists and paper watches
  • Charts, weather and passage planning
  • Deck, lines, cargo and upkeep
  • Watch, helm and lookout
  • Emergencies, abandon ship and fire
  • Life aboard, ports and fatigue
  • marinero
  • sailor
  • gente de mar

Sources for this job· O*NET 53-5011.00· ESCO/ISCO 8350

Analyse my job

Jobs with similar scores

  1. 194Fundraiser26%
  2. 195Ship agent26%
  3. 196Financial controller26%
  4. 198Web developer26%
  5. 199Game designer26%
  6. 200Set designer26%