IS WORK OVER?

Automation index

How much of a Drainlayer’s job can AI already do?

A drawing and a camera come earlier. Going down a pit and leaving it clear do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Drainlayer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawings, cameras and connection logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Open, pipe and set the fall.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Pits, gases and confined spaces.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Street, neighbours and reinstating pavement.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quantities, extras and the council.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a connection that bursts.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, cameras and connection logs
  • Open, pipe and set the fall
  • Pits, gases and confined spaces
  • Quantities, extras and the council
  • Not leaving a connection that bursts
  • pocero
  • alcantarillado
  • drainlayer

Sources for this job· O*NET 47-2151.00· ESCO/ISCO 7126

Roofer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order material and set out slopes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Tile, waterproof and finish ridges.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Heights, anchors and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, client and not cracking tiles.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a leak the first winter.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Measure, order material and set out slopes
  • Tile, waterproof and finish ridges
  • Heights, anchors and weather
  • Site, client and not cracking tiles
  • Logs, quantities and extras
  • Not leaving a leak the first winter
  • techador
  • cubiertas
  • roofer

Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7111

Analyse my job

Jobs with similar scores

  1. 617Scaffolder16%
  2. 618Baker16%
  3. 619Cleaner16%
  4. 621Lifeguard16%
  5. 622Tattoo artist16%
  6. 623Roofer16%